Skip Hire Liverpool Merseyside - call us now: 0151 922 5555
You need flash player please click here to download it then refresh your browser.

Telephone us now on
0151 922 5555
Mon to Fri 7am to 5pm
Sat 7am to 2pm

Plasterboard gypsum recycling

Plasterboard must now be segregated from general waste in the UK
Below are the main points of the November 2008 regulations from the EA regarding plasterboard waste:
  • Total ban on disposal of plasterboard waste at mixed waste landfills
  • The previous 10% rule is gone; the regulations are valid for any amount of plasterboard waste. A zero tolerance policy will be applied
  • Obligation for HWRC’s, construction & demolition contractors and transfer/sorting facilities to segregate plasterboard waste
  • Obligation to try to recycle and treat as much of the waste as possible

The EA clearly states:

“This material must not be land-filled with biodegradable waste. Producers of gypsum waste should separate it for recovery and recycling”.

 

Environmental

recycling Our fully licensed waste transfer station uses the latest recycling equipment to help reduce landfil tip. Merseyskips Recycling Ltd is also fully compliant with the new site waste management plans.

find out more?